THE DETAILS
A plan for your move.
Share your current and new office layouts, the items being moved and the timing your business needs. The scope should make clear what is ready for transport and what requires separate preparation.
What to include in your request
Workstations and office furniture
Include desks, chairs, shelving, meeting tables and storage units. Identify pieces that need disassembly or have special handling requirements so those tasks can be discussed in advance.
Equipment, files and labelled boxes
List computers, monitors, printers and other equipment by quantity and approximate size. Arrange for your IT team or qualified provider to prepare equipment and manage reconnection, backups and sensitive data.
Access and relocation sequence
Provide loading-dock details, elevator reservations, building access hours and a contact at each location. If a phased or outside-business-hours move would help, include your preferred schedule so availability can be checked.
How to prepare
- Create an inventory by department or destination room.
- Label furniture and boxes to match the new floor plan.
- Arrange IT disconnection, backups and reconnection separately.
- Confirm building access and nominate an on-site contact at each end.
Good questions. Clear answers.
Can the move happen outside normal office hours?
Include the dates and time windows you prefer. Availability and any building restrictions must be confirmed before booking.
Is IT setup included?
Do not assume technical setup is included in the move. Your IT team or service provider should handle preparation and reconnection unless a different scope is explicitly agreed.
Can unwanted office furniture be included for removal?
Choose Moving & junk removal and provide a separate list of the furniture to remove. Photos and access details help both parts of the job be reviewed.
